Examining Installation Site 50
Installation Tools 52
4SWITCH INSTALLATION
Confirming Installation Preparation | 53 |
| ||
Installation Flow | 53 |
|
|
|
Mounting the Switch in | ||||
Connecting PGND Wire and Power Cord | 59 | |||
Installing Cabling Rack | 64 |
|
| |
Installing Fan Tray | 64 |
|
|
|
Installing PoE Lightning Protection Box | 65 | |||
Installing I/O modules | 66 |
|
| |
Connecting Interface Cables 67 |
|
| ||
Cable Routing Recommendations | 70 |
| ||
Cable Management 70 |
|
| ||
Verifying the Installation | 73 |
|
|
5DEBUGGING THE SYSTEM
Setting up Configuration Environment 75
Powering and Booting the Switch 76
6SWITCH MONITORING AND MAINTENANCE
Monitoring the Switch | 79 |
Hardware Maintenance | 81 |
Upgrading the Software | 86 |
Password Loss 95 |
|
ALIGHTNING PROTECTION OF THE SWITCH
Installing a Lightning Arrester for the AC Power | 97 |
Installing a Lightning Arrester for the Network Port | 98 |
B3COM NETWORK MANAGEMENT
3Com | Network Supervisor | 101 |
3Com | Network Director | 102 |
3Com Network Access Manager 102 3Com Enterprise Management Suite 103
Integration Kit with HP OpenView Network Node Manager 103