SMC Networks Barricade specifications Power on

Page 10

Figure 2-6 Setup of WAN and Printer connections for this product.

4.Power on:

Connect the power cord to power inlet and turn the power switch on. The Barricade will automatically enter the self-test phase. When it is in this phase, the indicator M1 will light up for about 5 seconds, and then M1 will flash 3 times to indicate that the self-test operation is complete. Finally, the M1 will continuously flash once per second to indicate that this product is operating normally.

-9-

Image 10
Contents User Guide Trademarks Table of Contents Page Functions and Features IntroductionPacking List Virtual Server supportedHardware Installation Panel LayoutInstallation Requirements Top PanelProcedure for Hardware Installation Power on Network Settings and Software Installation Setting your computer network settings properlyInstall the Software into Your Computers Request timed outPage Page Configuring the Barricade Startup and LogStatus Toolbox Primary Setup Static IP Address Dhcp Server Choose Disable or Enable Dhcp ServerVirtual Server Virtual server mapping table Service Port Server IP Enable Special AP Access Control Miscellaneous Items Configuring on Windows 95/98 Platforms Print ServerPage Configuring on Windows NT Platforms Configuring on Unix based Platforms Appendix a Console Mode Appendix B TCP/IP Configuration for Windows 95/98 Installing TCP/IP protocol into your PCSetting TCP/IP protocol to work with the Barricade Page Don’t input any values in the Gateway tab Choose Disable DNS in the DNS Configuration tab Page Page That’s it. You are now ready to start using your Barricade Appendix C Installation Guide For Specific ISP @HomeMediaOne