transient response.
[6]During idle, the drive heads are relocated every 60 seconds to a random location within the band from
Table 13: ST3450802SS DC power requirements
|
|
|
|
|
|
| 1.5 Gb mode | 3 Gb mode | 6 Gb mode | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Notes | (Amps) | (Amps) | (Amps) | (Amps) | (Amps) | (Amps) |
|
|
|
|
|
|
|
|
| ||||
Voltage |
|
| +5V | +12V [2] | +5V | +12V [2] | +5V | +12V [2] | ||||
|
|
|
|
|
|
|
|
| ||||
Regulation |
| [5] | ±5% | ±5% [2] | ±5% | ±5% [2] | ±5% | ±5% [2] | ||||
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| [1] [6] | 0.36 | 0.33 | 0.38 | 0.32 | 0.32 | 0.31 |
Avg idle current DCX |
|
| ||||||||||
Maximum starting current |
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
| |||||
(peak DC) DC | 3σ | [3] | 0.47 | 1.78 | 0.61 | 1.78 | 0.46 | 1.77 | ||||
(peak AC) AC | 3σ | [3] | 0.92 | 4.04 | 1.00 | 4.14 | 0.76 | 3.45 | ||||
| 3σ |
|
|
|
|
|
|
| ||||
Delayed motor start (max) DC | [1] [4] | 0.44 | 0.04 | 0.46 | 0.04 | 0.46 | 0.04 | |||||
Peak operating current: |
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
| |||||
|
|
|
| [1] | 0.38 | 0.61 | 0.39 | 0.60 | 0.42 | 0.61 | ||
Typical DCX |
|
| ||||||||||
Maximum DC | 3σ | [1] | 0.38 | 0.64 | 0.40 | 0.61 | 0.43 | 0.62 | ||||
Maximum (peak) DC | 3σ |
| 1.00 | 2.46 | 1.02 | 2.48 | 1.04 | 2.42 | ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
[1]Measured with average reading DC ammeter or equivalent sampling scope. Instantaneous +12V current peaks will exceed these values. Power supply at nominal voltage. N (number of drives tested) = 6, 35 Degrees C ambient.
[2]For +12 V, a
[3]See +12V current profile in Figure 1.
[4]This condition occurs after OOB and Speed Negotiation completes but before the drive has received the Notify Spinup primitive.
[5]See paragraph 7.2.1, "Conducted noise immunity." Specified voltage tolerance includes ripple, noise, and transient response.
[6]During idle, the drive heads are relocated every 60 seconds to a random location within the band from
General DC power requirement notes.
1.Minimum current loading for each supply voltage is not less than 1.7% of the maximum operating current shown.
2.The +5V and +12V supplies should employ separate ground returns.
3.Where power is provided to multiple drives from a common supply, careful consideration for individual drive power requirements should be noted. Where multiple units are powered on simultaneously, the peak starting current must be available to each device.
4.Parameters, other than spindle start, are measured after a
5.No terminator power.
Cheetah NS 10K.2 SAS Product Manual, Rev. F | 21 |