GE DEH-40417 manual Astat -IBP Plus Service Instructions Table of Contents

Page 4

ASTAT ®-IBP Plus Service Instructions

Table of Contents

 

Cover Removal and Replacement

1

Logic Board Replacement

2

Power Supply Board Replacement

3

Protection Board Replacement

5

SCR Module Replacement (Sizes K, L, and Y)

6

SCR Module Replacement (Sizes M, Z, and N)

7

SCR Module Replacement (Sizes P, Q, and R)

8

SCR Module Replacement (Size S)

9

Trouble-Shooting Guide

11

Renewal Parts List

12

ii

Prices and data subject to change without notice.

Image 4
Contents Astat -IBP Plus Solid State Starters Page AS Used in this Publication Astat -IBP Plus Service Instructions Table of Contents Astat -IBP Plus Service Instructions Cover Removal and ReplacementAstat -IBP Plus Service Instructions Logic Board Replacement Location of the Power Supply Board Gate lead connections for sizes K, L, and Y Board Removing the SCR module Location of SCRs on size M, Z, N ASTAT-IBP Disconnecting the SCR load side Removing the busbar mounting bolt Forth several times to evenly distribute the grease on Astat -IBP Plus Service Instructions Troubleshooting Guide PCBAstat -IBP Plus Service Instructions Renewal Parts List QI3P,Q,R,SDPPage GE Industrial Systems