3 Installing the Switch
Figure 3-1. RJ-45 Connections
Equipment Checklist
After unpacking this switch, check the contents to be that sure you have received all the components. Then, before beginning the installation, be sure that you have all other necessary installation equipment.
Package Contents
•
•AC power cord
•Owner registration card
•Serial cable
•Rack mounting kit
•Quick Reference Guide
Getting Help
For additional support related to the product or this document, contact Enterasys Networks using one of the following methods:
Web http://www.enterasys.com/support
Phone
For the Enterasys Networks Support
Internet mail support@enterasys.com
To expedite your message, please type [eth] in the subject line.
•