Adaptec S50 quick start Powering On

Page 11

2To expand your configuration with multiple SANbloc S50 enclosures, continue to connect the EXP port of the previous enclosure to the HOST port of the next enclosure.

 

SANbloc S50 Enclosures

 

HOST

EXP

 

FAULT !

 

 

SEP MASTER

 

Snap Server

 

 

 

HOST

EXP

 

FAULT !

 

 

SEP MASTER

 

SAS Port

HOST

EXP

FAULT !

 

SEP MASTER

 

 

HOST Port

EXP Port

You can connect up to seven SANbloc S50 enclosures to a single Snap Server.

3Continue with “Powering On”.

Powering On

Before you begin, ensure that your Snap Server is powered off.

1Use the included power cords to connect each APC unit on each SANbloc S50 to an AC power source. Adaptec recommends that you use an uninterruptible power supply (UPS) to protect your enclosure, and that each APC unit be connected to a different UPS on a different building circuit.

2Power on all SANbloc S50 enclosures.

9

SANBloc S50 Quick Install Guide

Image 11
Contents Using the SANbloc S50 Jbod Enclosure with Snap Servers Copyright SANBloc S50 Quick Install Guide Enclosure Features and Accessories Installing Your Adaptec Enclosure into a Rack Secure both rackmount ears to the front vertical supports Before You Begin Installing Additional Disk DrivesRecommended Disk Drive Configurations Unsupported Disk Drive Combinations Installing the Disk DrivesConnecting One SANbloc S50 Enclosure Connecting to Your Snap ServerConnecting Additional SANbloc S50 Enclosures Powering On Registering Your SANbloc S50 Verifying that an Enclosure is OnlineGetting Help Service and Technical SupportSANbloc S50 Expansion Array 3 Years parts and labor Adaptec, Inc. Worldwide Limited WarrantySANBloc S50 Quick Install Guide FCC Notification Safety PrecautionsAuthorized Service SANBloc S50 Quick Install Guide Installation Cautions and Notes Page Milpitas Blvd. Milpitas, CA 95035 USA