Neuro Logic Systems 19, 17 specifications Hardware Installation, Step Detail

Page 3

RFT2 Rack Kit Installation Guide

Hardware Installation

Step

Detail

1. The following instructions assume that your equipment rack utilizes caged nuts. If you rack has pre-tapped holes there will be no need to include the caged nuts and the size of the mounting bolts may vary from that described.

Determine the vertical location for the LCD/keyboard in the rack. Mark the location with tape or a pencil. This product requires one rack unit (1 ”) of vertical space. Mount the LCD/keyboard at a convenient height for an average user. (Approx 44” from floor)

Ensure the bottom of the kit is properly positioned in a rack unit

2. Measure the distance from the front rack mounting rail to the rear rack mounting rail. (This distance will be needed during installation of the Rear slide mounting brackets in step 4)

Distance= _____________

07/01/06 Rev 1.0

Page 3 of 13

Image 3
Contents 1U 17 & 19 LCD and Sun Keyboard Box Inventory Step Detail Hardware InstallationRFT2 Rack Kit Installation Guide RFT2 Rack Kit Installation Guide Part a Cable Management InstallationServer, all systems should be turned off Connecting your LCD/KeyboardOperating the LCD/Keyboard Navigating the Menu RFT2 Rack Kit Installation Guide On-Screen Display OSD Menus Improperly matched timing Trouble Shooting Bad Image QualityGeneral Specifications SpecificationsLCD Panel Specifications Keyboard SpecificationsWarranty