Minuteman UPS UPS user manual Replacing the Battery, Authorized Service Personnel only

Page 13

English

REPLACING THE BATTERY

(AUTHORIZED SERVICE PERSONNEL ONLY)

The SmartSine UPS has an easy to replace hot-swappable batteries. Please read all of the Warnings and Cautions before attempting to service the batteries.

NOTE: If there is a power interruption while replacing the hot-swappable batteries, with the UPS on, the load will not be backed up.

WARNING! This Uninterruptible Power Supply contains potentially hazardous voltages. Do not attempt to disassemble the UPS beyond battery replacement procedures below. This UPS contains no user serviceable parts. Battery replacement must be performed

by AUTHORIZED SERVICE PERSONNEL ONLY.

CAUTION: Do not open or mutilate batteries. Released electrolyte is harmful to the skin and eyes and may be toxic.

CAUTION: Do not dispose of batteries in a fire. The batteries May explode. The batteries in this UPS are recyclable. Dispose of the batteries properly. The batteries contain lead and pose a hazard to the

environment and human health if not disposed of properly. Refer

to local codes for proper disposal requirements or return the battery to MINUTEMAN.

CAUTION: Although battery system voltages are only 24VDC, the battery system can still present a risk of electrical shock. The current capability of a battery is sufficent to burn wire or tools very rapidly, producing molten metal. Observe these precautions when

replacing the batteries:

1.Remove watches, rings, or other metal objects.

2.Use hand tools with insulated handles.

3.Wear protective eye gear (goggles), rubber gloves and boots.

4.Do not lay tools or other metal parts on top of batteries.

5.Disconnect the charging source prior to connecting or disconnecting the battery terminals.

6.Determine if the battery is inadvertently grounded. If the battery is, remove the source of the grounding. Contact with any part of a grounded battery can result in an electrical shock. The likehood of such shock will be reduced, if such grounds are removed during installation and maintenance.

12

Image 13
Contents Page English Important Safety Instructions Materials Authorized Service Personnel onlyFront Panel SWF Front Panel IndicatorsRear Panel Installation PlacementConnecting Your Equipment InstallationChecking the Site Wiring Fault Connecting the UPS to AN AC SourceCharging the Battery Communications Port Connection OptionalTurning the Unit ON/OFF DIP Switch SettingsSelf Test UPS Fault Alarms On BatteryReplace Battery LOW Battery WarningSymptom Possible Cause What To Do Authorized Service Personnel only Replacing the BatteryBattery Replacement Procedure English If the UPS Requires Service Model Number EPO Customized Output Receptacle Panels Limited Product Warranty Limited Product Warranty Declaration of Conformity 224 PN 34000196 Rev