Pressure Systems 9016 manual PC-280 Ethernet Microprocessor/A-D Board, PC-280 Board and Connectors

Page 7

Pressure Systems, Inc.

9016 Upgrade Instructions

PC-280 Ethernet Microprocessor/A-D Board

The following procedures should be used for removal of the PC-280 Ethernet Microprocessor/A-D Board. Use the tools and follow the general warnings already described.

(1)Carefully remove any attached wiring harnesses from connectors P1, P3, and P6 of the PC- 280 board. This will require cutting one nylon tie-wrap attached to the center mounting bracket. (See Figure 6)

Connector P6

Tie-wrap to cut

Connector P3

Connector P1

Figure 6

PC-280 Board and Connectors

(2)Remove the three (3) 2-56 Phillips head screws securing the PC-280 mounting brackets to the top plate. These screws will be in line with the PC-280 LEDs that protrude through the top plate. Save for later use. Carefully lift the board out of the top panel. (See Figures 6a and 6b.)

Figure 6b

PC-280 Board

Three screws to remove PC-280 board

Figure 6a

9016 Top Plate

6www.PressureSystems.com

Image 7
Contents Model Upgrade Instructions Packing List Exploded View of 9016 Scanner Top Plate Upgrade InstructionsUse caution not to slip and scratch the top plate Module DisassemblyRemove only Perimeter Screws PC-206 Amplifier/Multiplexer Board Out of HousingPC-206 Board PC-280 Ethernet Microprocessor/A-D Board PC-280 Board and ConnectorsPC-280 Board Tubing Routing Underneath PC-327 Board Installing the PC-327 Analog BoardPC-322/323 Boards P6 connection PC-327 Board Installing the PC-322/323 BoardsTop Plate to P1 Connection on PC-322 Finding Pin 1 on a PC BoardFigure 9aPC-327 Connection and Cable Tie-downNote Side View of 9016 Upgrade Top View of 9016 UpgradeFinal Checkout Final InstallationHeadquarters/Factory