POSIFLEX Business Machines HT-2212 Cleaning for Front Ventilation, Replacing Front Cover

Page 19
Push The Spring Buttons on Both Sides and Raise The Rear Part of Top Cover

Cleaning for Front Ventilation

Use vacuum cleaner to remove any dust or threads accumulation away from both the ventilation holes on front

cover and ventilation grids on chassis exposed after removal of the front cover.

Front Ventilation Grids on Chassis

Ventilation Holes on Front Cover

Replacing Front Cover

Follow the opposite procedure as removing the front cover to replace the front cover in position. Please make sure the all hooks on front cover is well positioned into chassis. Please remember to check that the power switch is at “Off” position before power and signal connection.

Accessing Side Ventilation Grids

The operation to further clean the side ventilation grids requires much more highly technical maneuver. Therefore careful attentions must be taken throughout the further cleaning operations below. When the main unit is opened, there must be no liquid spill, no electro-conductive material, no electric charged device come into the area of the main unit. Please also note that not to touch any component or cable inside.

Please first disconnect every cable from the main unit and turn the LCD panel to straight up position. Prepare enough space in front of the HT system and lay a piece of clean soft clothe of appropriate size there to prevent damage. With the back cable

cover opened, push in the circled spring button in the right picture on both sides

of chassis and raise the rear edge of the top cover. Apply some mild maneuver if there is already a pole display mounted.

Part 19

Image 19
Contents HT 2212 Pro Series User’s Manual Alert to OUR Honorable Customers Daily Maintenance GuideUSER’S Manual Brief IntroductionProduct Touch panel Option to have the set without touch panel Standard FeaturesOptional Items Compact Flash Memory Card Slot TypeSystem BOX Contents HALF-LENGTH PCI Extension Card Installation GuidesNON-USER-INSTALLABLE Options Technical EnhancementsWhen the HT system is installed Power AdaptorWireless LAN Option UPS Battery OptionCustomer Display Option or 2ND Display Side Mount Upgrade KIT SD-300/BC-300/KP-200 OptionCash Drawer Option Programmable Keyboard & Keypad OptionBarcode Scanner Option Printer OptionControl of the COM1 serial port Operating System RecoveryOperating System Installation Using the HT System Emergency treatment LED IndicatorsSerial Port COM1 Software Off Command Power ON/OFF ControlHardware Power Switch Can also be programmed to be an on only switchDisplay Controls Emergency Power OffMechanical Adjustments Main LCD Touch Monitor Touch terminal manager Side Mount Upgrade KIT BC-300/SD-300/KP-200 Customer Display USB FAN ControlRemoving Front Cover Ventilation MaintenanceAccessing Side Ventilation Grids Cleaning for Front VentilationReplacing Front Cover Side Ventilation Grids on Chassis Cleaning for Side Ventilation