OPERATION TESTS AFTER INSTALLATION
3.Test of
a.) See if the
b.) When the
4.Test of L1 lamp on IPTRK circuit card:
ATTENTION
Contents Static Sensitive
Handling Precautions Required
a.) See if the L1 lamp on the IPTRK circuit card is lighting green. This lamp will light if the FCCS network link is established.
b.) When the L1 lamp is OFF, make sure the office data was correctly assigned. If necessary, replace the circuit card.
5.Test of
a.) See if the
b.) When the
6.Test of
a.) See if the
b.) When the
7.Test of
a.) See if the
b.) When the
8.Test of Speech Conditions with Distant Nodes:
a.) Perform the connection tests to see if speech can be made with the counterparts of the connected nodes.
b.) If any test result is abnormal, make sure the related office data was assigned correctly.
9.Test of System Messages:
a.) When an IPTRK circuit card is installed, the following messages may be created:
23-S FCCS FAILURE
b.) When any of the messages above are created, make sure that the Ethernet cable is securely connected to the IPCON/FCON connector (on the IPTRK circuit card), or perform the continuity test of the cable (voltage and resistance measurement), using a voltmeter.
Note: Although this message is issued soon after performing system/circuit card initialization, it does not necessarily mean a result of fault information. In this case, the message generally indicates the placement of the IPTRK circuit card in to normal operation mode.