American Power Conversion 5000RMB user manual Vac Units for Hard Wire

Page 11

230 Vac Units (for Hard Wire)

Caution:

The electrical connection must be made by an authorized electrician according to national and local regulations.

Verify that the supply line contains a 25 Amp circuit breaker BEFORE hardwiring the UPS.

Ensure that the batteries are not installed in the UPS until the hardwiring is complete.

Incorporate a readily accessible disconnect device in the fixed wiring design.

1.Select the appropriate wire size and connectors. For most applications, #10 AWG (5 sq. mm) wire should be sufficient.

2.The input wiring terminal is located on the rear panel of the UPS. Remove the access door n by unscrewing the single screw o which holds it in place.

n o p

3.Slide the wire input plate p to the left to remove it. This will expose the input wiring terminal.

L2/N L1

4.Use a screwdriver or any hard object to detach the circular knockout. You may need to use pliers to fully detach the knockout.

5.Feed the wire cable through the hole in the wire input plate. Using a threaded lock nut, fasten the plate to the selected cable or conduit connector.

6.Use a knife or pliers to strip off the plastic on the end of the cable to expose the copper wire. Strip all three wires.

7.Use a flathead screwdriver to connect the wires to the terminal block inside the UPS. Loosen the screw, then feed the copper wire into the terminal block and tighten the screw. Connect the protective earth ground to the terminal block at the position marked with the ground symbol (). Adhere to all national and local electrical codes.

L2/N L1

8.Once all the wires are connected to the terminal block, reconnect the wire input plate to the UPS. Align the plate, position it into the grooves, and slide it to the right.

9.Inspect the connections and location of the excess wires before installing the access door.

10.Replace the access door and fasten with the screw (removed in step 2).

5

Image 11
Contents 990-7080C 03/2005 990-7080C 03/2005 Replacement and Recycling of Batteries Handling SafetyElectrical Safety Page Table of Contents Page Unpacking ContentsHow to Unpack the SU 5000 UPS IntroductionPosition the UPS InstallationPlacement Installing the SU5000RMBLeft Front Vac Units with Line Cord Connect Input Power to the UPSVac Units Vac Units for Hard Wire Connect Equipment to the UPS Install the BatteriesPower up the UPS and Accessories Install PowerChute and AccessoriesInitial Startup Operating Instructions SmartBoost Low BatteryOverload SmartTrimBattery Replacement Procedure Replacing the BatteryExtended storage User Configuration ItemsStorage Storage ConditionsOn-Battery Run Time Specifications Problem and Possible Cause Solution UPS will not turn on TroubleshootingAPC Contact Information ServiceLimited Warranty Radio Frequency Interference 200/208 Vac UnitsVac Units Appendix B Transporting Your Smart-UPS