American Power Conversion 5000RMB user manual Replacing the Battery, Battery Replacement Procedure

Page 16

Replacing the Battery

This UPS has an easy to replace hot-swappable battery. Battery replacement is a safe procedure, isolated from electrical hazards. You may leave the UPS and loads on for the following procedure. See your dealer or call the number listed under APC Contact Information, page 15, for information on replacement battery cartridges.

Note:

Please read the cautions in the Safety section at the beginning of this User’s Manual.

Once the battery is disconnected, the loads are not protected from power outages.

Model Number

Replacement Battery Cartridge (RBC) #

SU5000RMB

RBC 12 (two required)

 

 

Battery Replacement Procedure

1.Reach into the finger pull and open the front cover. Swing the cover open as shown.

Remove the front bezel by grasping the finger clips on the side of the bezel and carefully loosening the four (4) snaps. Skip to step 3.

2. Unhook the side of the cover from the chassis and lift it away to expose the battery door.

3.Use a screwdriver or a coin to remove the two (2) battery door screws and open the door.

4. Disconnect the front battery pack:

grip the white cord on the front set of batteries and pull firmly to disconnect the connector.

5.Pull the front battery out of the UPS by pulling on the clear label, not the white cord.

Notes:

Be careful removing the batteries - they are heavy. Support the bottom of the batteries as

you remove them. There are four sets of batteries.

6.Reach into the battery compartment and grasp the white cord on the other battery connector. Pull firmly to disconnect the connector and remove the rear set of batteries.

7.Slide the rear set of new batteries into the unit.

Hold the battery pack so that the leads are on the right-hand side. Slide the battery pack into the UPS.

Press the gray connector into the plug at the bottom and to the right of the battery compartment. Tuck the white cord (that serves as a handle for the connector) neatly to the side.

8.Slide the front set of batteries in, then guide the connector over the batteries and press firmly to connect it to the front connector of the battery compartment.

Notes:

Repeat steps 4 through 9 for the second set of batteries.

Small sparks at the battery connectors are normal during connection.

9.Close the battery door, replace the screws, and replace the front cover.

Batteries must be recycled. Deliver the battery to an appropriate recycling facility or ship it to the supplier in the new battery’s packing material. See the new battery instructions for more information.

10

Image 16
Contents 990-7080C 03/2005 990-7080C 03/2005 Electrical Safety Handling SafetyReplacement and Recycling of Batteries Page Table of Contents Page Contents How to Unpack the SU 5000 UPSIntroduction UnpackingInstallation PlacementInstalling the SU5000RMB Position the UPSLeft Front Vac Units Connect Input Power to the UPSVac Units with Line Cord Vac Units for Hard Wire Install the Batteries Power up the UPS and AccessoriesInstall PowerChute and Accessories Connect Equipment to the UPSInitial Startup Operating Instructions Low Battery OverloadSmartTrim SmartBoostReplacing the Battery Battery Replacement ProcedureUser Configuration Items StorageStorage Conditions Extended storageOn-Battery Run Time Specifications Troubleshooting Problem and Possible Cause Solution UPS will not turn onLimited Warranty ServiceAPC Contact Information Vac Units 200/208 Vac UnitsRadio Frequency Interference Appendix B Transporting Your Smart-UPS