American Power Conversion 250VA, 110Vac user manual 110/120 V model

Page 10

NOTE: SETTINGS ARE ADJUSTED THROUGH POWERCHUTE SOFTWARE

FUNCTION

FACTORY

USER SELECTABLE

DESCRIPTION

DEFAULT

CHOICES

 

 

Synchronized

0 seconds

0, 60, 180, 300

Specify the time the UPS will wait

Turn-on Delay

 

seconds

after the return of utility power before

 

 

 

turn-on (to avoid branch circuit over-

 

 

 

load).

 

 

 

 

High Transfer

110/120 V model:

110/120 V model:

Set the high transfer point higher to

Point

127 Vac

127, 130, 133, 136

avoid unnecessary battery usage when

 

 

Vac

the utility voltage is usually high and

 

230 V model:

230 V model:

the connected equipment is specified

 

to operate with input voltages this

 

253 Vac

253, 257, 261, 265

 

high.

 

 

Vac

 

 

 

 

 

 

 

Low Transfer Point

110/120 V model:

110/120 V model:

Set the low transfer point lower when

 

106 Vac

97, 100, 103, 106

the utility voltage is usually low and

 

 

Vac

the connected equipment is specified

 

230 V model:

230 V model:

to operate with input voltages this low.

 

 

 

208 Vac

196, 200, 204, 208

 

 

 

Vac

 

 

 

 

 

8

Image 10
Contents APC Smart-UPSSC Page Unpack IntroductionPosition the UPS Rack-Mounting Tower Configuration Wall Mounting Connect the UPS to the Network if Applicable Connect Equipment to the UPSStart the UPS Front Display Panel User Configurable Items 110/120 V model Battery Replacement StorageTROUBLESHOOTING, SHIPPING, and Service Replace Battery LED is Illuminated Shipping and Service Regulatory and Warranty Information Limited Warranty