Figure 5. Level the stand at the mounting location and mark the holes. | Figure 6. Drill pilot holes at the marked locations. Widen any | |||
4 | Place the bracket against the wall at the desired location. | 6 | Using a 1/8" bit, drill four pilot holes. | |
| It is important that the entire area behind the bracket, |
|
|
|
| and 8.5 inches to the left and right of the bracket be |
|
| IMPORTANT! If you drill into a stud during this |
| free from obstructions and completely flat. |
|
| step, DO NOT widen the hole and DO NOT |
|
|
|
| install a toggle bolt wall anchor at this location— |
| IMPORTANT! To allow the Stage to fully rotate |
|
| you will eventually be installing a lag bolt dierctly |
| up or down, the following area must be free of |
|
| into the stud. |
| obstructions: |
|
|
|
| 7 | Use a 1/2" drill bit, widen the pilot holes so toggle bolt | ||
| — 4 inches above of the bracket | |||
|
|
| wall anchors can be installed. |
—6 inches below of the bracket
—8.5 inches left and right of the bracket
5Using a level, square the bracket and mark the 4 hole locations.