Parallel Connection

When making a parallel type of connection (Figure 1), the length of the wiring to the Surge Protection Device (SPD) must be kept as short as possible to substantially enhance the performance. Long wire runs are to be avoided if the unit is to perform as intended.

 

7R￿￿3URWHFWHG￿￿/RDGV

 

 

3KD

￿$

 

3KD

￿%

3KD

3KD￿1HXWUDOLI￿XVHGH￿&￿

 

1HXWUDO

1HXWUDO￿%XV

 

 

 

￿LI￿XVHG￿

 

 

*URXQG

*URXQG

 

*URXQG￿%XV

 

 

Interconnecting Wiring

 

* Minimize Length

 

* Avoid Sharp Bends

 

)LJXUH￿￿￿￿7\SLFDO￿3DUDOOHO￿&RQQHFWLRQV

 

To reduce the impedance the wire displays to surge currents, the phase, neutral (if used), and ground conductors are to be routed within the same conduit and should be tightly bundled or twisted together to optimize performance of the unit. Sharp bends in the conductors are to be avoided.

Wire Size

With a parallel connection, the size of the wiring to the SPD is independent of the ampere rating of the circuit to be protected. The recommended wire size is based on the unit’s transient surge current capabilities. #6 AWG is the rec- ommended wire size for phase, neutral, and ground.

**Surge Protection Devices are designed for use on the load side

of the service entrance disconnect only**

Typical Unit Installation - Three Phase WYE, 4 Wire, plus Ground

This section provides basic installation instructions for the PM3 and PM4 SPDs. Per UL 1449 Paragraph 1.4, SPDs "are intended for installation on the load side of the main overcurrent protection". Locate the SPD as close as possible to the circuit to be protected to minimize the wire length. This will optimize SPD performance.

Note that these instructions are not intended to supercede local or national codes. The installation should be per- formed by a licensed electrician. To install a PM3 or PM4 SPD, refer to Figure 2 and proceed as follows:

1.Unpack and inspect the unit for signs of damage. If the unit is damaged, contact APC Customer Service (see Page 17 for the APC Customer Service phone number, as well as obtaining service under the Warranty.

2.Locate where the unit is to be installed. Ensure wire lengths between the SPD and the service panel are kept to a minimum.

Page 5

Image 8
Contents 990-0524 10/00 6XUJH$UUHVWŠ306HULHV Figures Installation TestingIntroduction Unpacking & Preliminary InspectionLocation Considerations EnvironmentAudible Noise Mounting and Cabinet DataService Clearance Product Orientation7DEOH9ROWDJH5DWLQJDQG6HUYLFH7\SHE\0RGHO Voltage Rating0RGHO1XPEHU Terminals7R3URWHFWHG/RDGV 3KD 1HXWUDO 1HXWUDO%XV LI Xvhg Urxqg URXQG%XV$51,1 1875 Lvfrqqhfw 2SWLRQ Disconnect Switch OptionDXJKWHUERDUGIRU2SWLRQDO6XUJH&RXQWHU6KRZQ $51,1 Surge Counter Option Status Panel Controls, Indicators, and AlarmsLJXUH6WDWXV3DQHOZLWK6XUJH&RXQWHU2SWLRQ Corrective Maintenance Repair Troubleshooting7DEOH5HOD\&RQWDFW3LQ$UUDQJHPHQW Dry Contacts OptionDOO LJXUHLVSOD\%RDUG/RFDWRULDJUDP LVFRQQHFWSRZHUWRWKH63LJXUHLDJQRVWLF%RDUG/RFDWRULDJUDP Diagnostic Board Removal and Replacement InstructionsSurge Module Removal and Replacement Instructions Preventive Maintenance Inspection and Cleaning LJXUH6XUJH0RGXOH5HPRYDODQG5HSODFHPHQW9ROWDJH6\VWHP Hvfulswlrq 3DUWRUNVLWK 1XPEHU Replacement Parts Listing7DEOH5HSODFHPHQW3DUWV/LVW Return Shipment Address Limited WarrantyTechnical Support and Customer Service