EAW KF730, SB730 Ground Stacking Procedures, Setting the Tilt Angle for the Entire Array

Page 22

5.Attach each Hinge to the Hinge Tube by inserting a Quick Release Pin (removed in Step 2) through both.

6.Insert a Quick Release Pin (removed in step 2) into each of the enclosure’s rear Hinge Tubes as a locking pin. See “Locking Pins” Section 6.4.5.

7.Lift the Array, with the KF730 attached only by its rear Hinges, to a comfortable working height for the next step.

8.Employing two people, one lifts the front of the KF730, rotating it on the attached rear Hinges.

9.The second person slides the KF730’s front Hinges into the suspended KF730’s Hinge Tubes.

CAUTION: When attaching the front Hinges, the normal configuration is tight packing the enclosure fronts unless otherwise configured by the Wizard.

NOTE: It will usually be necessary to nudge the KF730 enclosure being attached backwards to line up its Hinges with the Hinge Tubes on the suspended enclosure above.

10.Attach each Hinge to the Hinge Tube by inserting a Quick Release Pin (removed in step 7) through both.

11.Repeat Steps 1 to 10 for additional KF730s.

6.7.7Setting the Tilt Angle for the Entire Array

Normally, the easiest method is to use a clinometer, such as a simple, bubble- type angle finder (pictured). More sophisticated, albeit more expensive, electronic clinometers can also be used.

Place the angle finder against one of the rigging tubes on the face of the uppermost enclosure in the array that can be physically reached. Adjust the angle of the entire array so that the face of this enclosure is set at its prescribed aiming angle listed in the KF730 Wizard on the Array Tab.

6.8GROUND STACKING PROCEDURES

Up to six KF730s and up to four SB730s may be ground-stacked. Always stack KF730s using the SB730(s) or the KF730 Fly-Bar as a base for the stack.

DANGER: A ground stack of more than six KF730 enclosures may shift the center of gravity making the stack unstable. Failure to follow this warning may result in damage to the equipment damage, injury, or death.

6.8.1Stacking With SB730(s) as the Base

IMPORTANT NOTE: If using one or more SB730s as the stacking base, all KF730 and SB730 enclosures are stacked right side up. Always stack all SB730s underneath the KF730s.

1.At the desired stacking location, position an SB730 on the floor with the Hinges on the top, this being the normal orientation for suspension.

Page 22 of 28 RD0169 (A) KF730 & SB730 OWNER’S MANUAL

Image 22
Contents KF730 & SB730 Loudspeaker EAW Part RD0169Page Table of Contents Read this First Safety PrecautionsGeneral Precautions EC Statement of ConformityUnpacking ContentsIntroduction Shipping DamageKF730 Array Design Fill CoverageGround Stacking SubwoofersSignal Delay on Subwoofers Other SubwoofersArray Operation System Block DiagramSignal Processing OverviewUser Adjustments Amplifier Gain SettingsAmplifier Power Requirements Selecting an Appropriate Amplifier Size KF730 QtyOperating Limits Input ConnectionsSelecting an Appropriate Amplifier Size Rule Of Thumb 1 KF730 Input Connections2 SB730 Connections 3 SB730 System Input Connections+ -- + Wire Gauge4 KF730P Input Connections 5 SB730P Input ConnectionsRigging Warnings RiggingSuspension Load Rating Working Load Limit WLL FLY-BAR Rigging Recommendations Attaching Enclosures to the FLY-BARQuick Release Pins Hinge and Hinge Tube HolesLocking Pins KF730 and SB730 Hinge and Hinge Tube HolesPallets Initial Rigging Preparation2 SB730s on SB730 Pallet Suspension Procedures1 KF730s On KF730 Pallet Attaching a KF730 or SB730 to the Fly-BarAttaching a KF730 to an SB730 Already Suspended Attaching SB730s to SB730s Already SuspendedAttaching KF730s to KF730s Already Suspended Setting the Tilt Angle for the Entire Array Ground Stacking ProceduresStacking With SB730s as the Base Stacking With the Fly-Bar as the Base Stacking Additional Enclosures SB730 as the baseStacking the First Enclosure Fly-Bar as the base Stacking Additional Enclosures Fly-Bar as the base Contacting EAW Service InformationLiterature and Specifications Operating QuestionsRigging Service Service and MaintenanceGeneral Service Basic Field TroubleshootingMaintenance Eastern Acoustic Works ONE Main Street WHITINSVILLE, MA