Scanner Installation
To maintain compliance with applicable standards, all circuits connected to the scanner must meet the requirements for SELV (Safety Extra Low Voltage) according to EN 60950. To avoid potential problems, do not power up the scanner until the communication cable is secured to the host.
1."Power off" the host system.
2.Locate the
3.Connect the other end of the communication cable to the host device. (If the scanner is powered by the host, skip to Step 5.)
4.Check the AC input requirements of the transformer/power supply to make sure the voltage matches an available AC outlet. Plug the transformer into the AC outlet to supply power to the scanner. (A
5."Power up" the host system.
Note: When the scanner first receives power, the LEDs will flash and then the scanner will beep once. After the scanner performs this startup sequence, the green LED will remain on for a specified time indicating that the laser is on.
2