Peerless Industries RTR-UNW, PRS-UNV-S, RTR-UNS Installation to Concrete Ceilings, Illustration a

Page 6

Installation to Concrete Ceilings

WARNING

Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor.

Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard- ware and components.

3

Place projector mount assembly (A) on ceiling as a

template and mark the center of the two mounting

holes. Drill two 1/4" (6 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach projector mount assembly (A) using two concrete anchors (D), two flat washers (F), and two #14 x 2.5" wood screws (C) as shown in Illustration A and 1, 2, and 3.

Note: Mounting slots on projector mount assembly allow for 30° (±15°) of rotation before fully securing wood screw.

Tighten wood screws (C) using 3/8" (10 mm) socket

wrench or phillips screwdriver until projector mountD assembly (A) is firmly attached.

 

FRONT OF

Skip to step 5.

MOUNT

WARNING

A

F

• Tighten wood screws firmly, but do not overtighten.

Overtightening can damage the screws, greatly

C

reducing their holding power.

 

• Never tighten in excess of 80 in • lb (9 N.M.).

Illustration A

WARNING

1

 

surface

 

 

 

concrete

• Always attach concrete anchors directly to load-

 

 

D

bearing concrete.

 

 

 

 

 

• Never attach concrete anchors to concrete covered

Drill holes and insert anchors (D).

 

 

with plaster, drywall, or other finishing material. If

 

 

 

A

 

mounting to concrete surfaces covered with a finishing

2

 

surface is unavoidable, the finishing surface must be

 

counterbored as shown below. Be sure concrete

 

 

 

anchors do not pull away from concrete when tighten-

 

C

D

ing screws. If plaster/drywall is thicker than 5/8",

 

custom fasteners must be supplied by installer (not

Place plate (A) over anchors (D) and secure with screws (C).

UL approved).

 

 

 

 

 

INCORRECT

 

CORRECT

3

VIEW

 

 

 

A

concrete

A

concrete

 

 

 

CUTAWAY

 

 

 

 

plaster/

 

plaster/

Tighten all fasteners.

 

 

 

 

 

drywall

 

drywall

 

 

 

 

 

 

 

 

6 of 12

ISSUED: 09-19-05 SHEET #: 055-9441-5 10-31-08

Visit the Peerless Web Site at www.peerlessmounts.com

For customer care call 1-800-729-0307 or 708-865-8870.

Image 6
Contents Maximum UL Load Capacity Tools Needed for Assembly Table of ContentsParts List Installation to Extension Column / Ceiling Plate Skip to stepInstallation To Wood Joist Ceilings Installation to Concrete Ceilings Illustration aInstallation to Threaded Rod Not evaluated by UL Professional installation onlyPage Attaching Adapter Plate to Projector Projector Alignment PRS Series Projector Mount Accessories Cord Management
Related manuals
Manual 12 pages 46.63 Kb