Jabra SP-CEIL-012 installation manual Ceiling and Wall Installation, Single Stud Installation

Page 6

SP-CEIL-012

Ceiling and Wall Installation

Unpack the Gyrolock® and review any WARNING statements that apply to the installation. Select the desired location for the Gyrolock®. There are three mounting points for a single stud installation and four mounting points for a solid structure installation.

NOTE: Pre-drill all holes (pilot hole – 1/8” drill bit).

Single Stud Installation

1.Locate the center of the single stud where the Gyrolock® will be installed. The two (2) center mounting points for this installation must be used. Use a stud finder to locate the stud that will be used to mount the PBL (ceiling or wall). It is advised that all holes be pre-drilled with a 1/8” drill bit.

2.Secure the upper plate to the single stud with the two (2) #14 wood screws (supplied).

3.Start to secure the plate to the outer mounting points first. The plate may travel ½" front to back from center.

4.Secure the final wood screw to the center of the upper plate (Figure 1).

SINGLE STUD

Figure 1. Single Stud Installation

Page - 6 -

Installation Manual

Image 6
Contents Installation Manual SP-CEIL-012 Page Table of Contents Installation Manual Parts List Installation ToolsCeiling and Wall Installation Adjustable Height Height AdjustmentAdjustments and Extension Arm SP-EXTARM-01 SP-EXTARM-02 SP-EXTARM-03 SP-EXTARM-04Mount Installation SP-CEIL-012 Troubleshooting Procedures QuestionTechnical Specifications Technical DimensionsWarranty Contact InFocus CorporationInFocus Corporation