Position front (#49) and rear (#56 & #48) supply stack guides so that the posts clear the paper stack by about 1/16”. A stack of 2 to 3 inches is required.
Locate adjustable stack guide post (#59) so that the post is in line with the separating knife. (Figure 13).
48
59
56
49
TO BE IN
LINE
Figure 13
Install front guide rail (#55) so that there is about 1/8” to 1/4” clearance between the lift being transferred and the front guide rail.
Cycle machine and check results.
108
55
29
Figure 14
7