Before Installing the Switch Blade

The M6100 series switch blades are designed to be installed in the XCM8903 rack-mount switch chassis. NETGEAR recommends installing the XCM8903 rack-mount chassis into a rack before installing any switch blades. For more information about how to install the XCM8903 rack-mount switch chassis, see the XCM8903 Hardware Installation Guide.

4

Image 4
Contents Installation Netgear ProSAFE M6100 Chassis SwitchContents M6100 Series Front Panels Before Installing the Switch Blade Install the Chassis ¾¾ To bracket-mount the chassisInstall the Fan Tray ¾¾ To install the fan trayInstall the Switch Blade Page Install the Power Supply ¾¾ To install the power supplyInstall Optional PoE XCM89P or UPoE XCM89UP Board ¾¾ To install the optional PoE XCM89P or UPoE XCM89UP boardConfigure the Switch Blade Computer in Dhcp Client Mode Without a Dhcp Server ¾¾ To configure the switch Computer with a Static IP AddressData bits Parity. None Stop bit Flow control. None Page Computer in Dhcp Client Mode with a Dhcp Server Data bits Parity. None Stop bit Flow control. None Page Page Technical Support