NETGEAR XCM8924X, XCM8948, XCM8944, XCM89P Install the Power Supply, ¾¾ To install the power supply

Page 9

CAUTION:  Be careful to avoid over torquing and stripping the screw heads.

Install the Power Supply

¾¾ To install the power supply:

1.Carefully slide the power supply all the way into the power supply bay until it clicks into place.

Locking handle

CAUTION:  Do not slam the power supply into the system backplane. Use the locking handle to secure the power supply in the power supply bay.

2.Repeat Step 1 to install each additional power supply.

3.After all the power supplies have been installed, connect an

9

Image 9
Contents Netgear ProSAFE M6100 Chassis Switch InstallationContents M6100 Series Front Panels Before Installing the Switch Blade ¾¾ To bracket-mount the chassis Install the Chassis ¾¾ To install the fan tray Install the Fan TrayInstall the Switch Blade Page ¾¾ To install the power supply Install the Power Supply¾¾ To install the optional PoE XCM89P or UPoE XCM89UP board Install Optional PoE XCM89P or UPoE XCM89UP BoardConfigure the Switch Blade Computer in Dhcp Client Mode Without a Dhcp Server Computer with a Static IP Address ¾¾ To configure the switchData bits Parity. None Stop bit Flow control. None Page Computer in Dhcp Client Mode with a Dhcp Server Data bits Parity. None Stop bit Flow control. None Page Page Technical Support