Chapter
2
Configuration and Installation
This chapter contains configuration and installation instructions for the
Physical Installation
Configuration
Before Apply Power: Checklist
Board Address Selection Switches
Address Modifier Response Selection
Digital Code Selection
Program Controlled and External Start Convert Mode
Connector Descriptions
Analog Output Accuracy
DAC Zero Offset and Gain Calibration
Caution
Some of the components assembled on GE Fanuc’s products may be sensitive to electrostatic discharge and damage may occur on boards that are subjected to a high energy electrostatic field. Unused boards should be stored in the same protective boxes in which they were shipped. When the board is to be placed on a bench for configuring, etc., it is suggested that conductive material be inserted under the board to provide a conductive shunt.
Upon receipt, any precautions found in the shipping container should be observed. All items should be carefully unpacked and thoroughly inspected for damage that might have occurred during shipment. The board(s) should be checked for broken components, damaged circuit board(s), heat damage, and other visible contamination. All claims arising from shipping damage should be filed with the carrier and a complete report sent to GE Fanuc together with a request for advice about the disposition of the damaged item(s).