GE VG4252 manual Using Two VCRs for Copying and Editing Tapes

Page 27

Recording a Program

Using Two VCRs for Copying and Editing Tapes

Operating Instructions (Refer to hookup on page 6.)

Use one VCR as the playback VCR and the other as the recording VCR.

Caution: The unauthorized recording of television programs and other materials may infringe the rights of others.

1.Turn on the TV and VCRs.

2.Tune TV to the VCR viewing channel, either 3, 4, or TV’s video input.

3.If you have connected your VCR using Option A (page 6), tune recording VCR to channel 3 or 4 — the one selected on the back of the playback VCR. If you have connected your VCR using Option B (page 6), press INPUT on recording VCR to select the line input. LINE appears in VCR’s display panel.

4.Insert the tape you want to copy into playback VCR. Insert a blank tape with safety tab in place into recording VCR.

5.Press PLAY, then PAUSE on playback VCR when you reach the point on the tape or program where you want to begin copying. If the tape was not recorded on the playback VCR, streaks may appear and you may need to adjust tracking. To prevent on-screen displays on the playback VCR from appearing on the recording, press DISPLAY button three times. See page 15.

6.Press RECORD, then PAUSE, on recording VCR.

7.Press PAUSE buttons on both VCRs at the same time to begin copying the tape.*

8.Edit out segments that you do not want to copy by pressing PAUSE on recording VCR to stop copying the tape. Then locate the next segment you want to copy on the playback VCR by using FWD, REW, and PLAY. Press PAUSE on the playback VCR. Press PAUSE at the same time on both VCRs to resume copying.

9.Press STOP on both VCRs when you are finished.

*You may turn off the TV after the recording has started as it does not have to be on to copy a tape.

Copying and Editing Using Compatible Remote

If you have a compatible GE, RCA, or ProScan remote with VCR1 and VCR2 buttons, you can program this VCR to respond to VCR1 (VCR2). This will allow you to control both VCRs with one remote for easier copying and editing.

Set the Remote Control feature of this VCR to the VCR1 or VCR2 position. The remote then controls the VCR with either the VCR1 or VCR2 button — whichever position you select in the menu.

1. Press MENU to display the VCR MAIN MENU.

2. Press 4 to display PREFERENCES.

3.Press 1 to activate the Remote Control feature.

4. Press VCR1 or VCR2 on your compatible remote to change the setting and program this VCR to respond to the VCR1 or VCR2 button — whichever you select.

Important Reminder: Remember you must press VCR1 or VCR2 on the remote — whichever you selected in the menu — before the remote will operate this VCR.

VCR MAIN MENU

1 Timer Recordings

2 Set Clock

3 Channels

4 Preferences

PREFERENCES

1 Remote Control: VCR1

PREFERENCES

( PRESS

VCR2 TO CHANGE )

2

Auto Play:

ON

3

Auto TV/VCR:

ON

4

Front

Panel:

AUTO

0

Exit

 

 

25

Image 27
Contents VCR User’s Guide Product Registration Important InformationTable of Contents Choose one answer from below Optional Hookups How to hook up two VCRs for copying tapesChoosing a Hookup What type of Cable-TV system* do you have?Back of VCR Antenna or Cable System Without a Cable BoxBasic hookup Advanced hookupPlug in power cords of VCR, TV, and cable box Cable System With Cable Box to Unscramble All ChannelsBack of VCR Cable Box Cable System With Cable Box to Unscramble Pay Channels Only Recording Connecting Two VCRs for Copying TapesOption a Hookup Option B HookupTurn on the VCR Check accessories with VCRStartup Insert batteries in remote Turn on the TVPress 1 to begin Auto Channel Search Place channels in the VCR’s memorySkip this step if you used one of the basic hookups Set the Auto TV/VCR featureAdd or remove channels from the VCR’s memory Set the time and datePress 4 to select Front Panel AUTO, DIM or Bright Use Tvvcr buttonSelect the display panel brightness Skip this step if you used one of the advanced hookupsSlow or + ButtonsChannel Up or Down Displays INDEX, TIME, and GO-TO Search menus on TVTo play a tape Using the Playback FeaturesAuto Play Feature PlaybackPause for Stop Action Frame AdvanceSlow Motion Fast Forward Search Picture SearchAutomatic Tracking Manual TrackingDisplay Button Time Counter00000 To Index Search Commercial Scan Search ButtonIndex Search Go-To SearchTo Select Playback Sound Tape Playback HI-FI/LINEAR/MIX FeatureTo Make a Recording RecordingsNormal Recording Recording SpeedsRecording While You’re Away Timer Recording Setting a Timer RecordingStopping a Recording in Progress Select Cable Box Viewing Channel If you have a cable box, follow the directions belowPress 2 for Only Some channels Checking or Clearing Timer Recordings Timer Recording From the VCR’s Line InputPress 2 for Review Existing Progs. feature Display on TV Screen One Touch RecordingTo Record Stereo Broadcast TV or SAP Recording Broadcast Stereo TV or SAP Second Audio ProgramTo Play Back Audio Only Recording FeaturesRecording Audio Only To Record Audio OnlyCopying and Editing Using Compatible Remote Using Two VCRs for Copying and Editing TapesLocation of Controls Front PanelRemote Sensor Video and Audio R Right and L Left OUT Jacks From ANT. Antenna ConnectorBack Panel Video and Audio R Right and L Left in JacksE R E O H i F i S a P Display PanelCleaning the VCR SpecificationsTrouble Heres what to try Trouble ChecksWill not auto search active Timer recording not made or wrong programCassette with safety tab removed does not start to RecordedLimited Warranty ADD/REMOVE Channel Menu IndexPart Number 96-VG4252-1 10330 N. Meridian Street Indianapolis,

VG4252 specifications

The GE VG4252 is a sophisticated gas turbine designed for power generation and various industrial applications. Known for its efficiency and reliability, the VG4252 model represents a significant advancement in gas turbine technology, making it a valuable asset for energy producers and manufacturers worldwide.

One of the main features of the VG4252 is its advanced combustion system, which enables high efficiency and lower emissions. This gas turbine utilizes a dry low emissions (DLE) technology to significantly reduce nitrogen oxide (NOx) emissions, contributing to a more environmentally friendly operation. The DLE system operates by carefully managing the fuel and air mixture to minimize emissions while maintaining optimal performance.

The VG4252 is designed for modularity and flexibility, allowing it to be effectively deployed in various applications, including mechanical drive systems and electricity generation. Its modular design facilitates easier maintenance and quicker repairs, which optimizes operational uptime and reduces the overall cost of ownership.

In terms of performance, the VG4252 offers high thermal efficiency, contributing to reduced fuel consumption and operational costs. The turbine operates with a high level of efficiency across a wide range of loads and conditions, making it suitable for peak load and baseload applications. The advanced aerodynamic design of the turbine blades enhances performance, allowing the VG4252 to extract maximum energy from the fuel used.

The VG4252 incorporates state-of-the-art monitoring and control technologies, ensuring optimal performance and reliability. Real-time monitoring systems provide valuable data on engine performance, enabling operators to detect potential issues early and perform timely maintenance. This predictive maintenance capability contributes to increased reliability and minimizes unexpected downtime.

Additionally, the turbine is compatible with a variety of fuels, including natural gas and liquid fuels, enhancing its operational flexibility. This capability allows facilities to adapt to changing fuel availability and pricing, which is crucial in the current energy market.

In summary, the GE VG4252 gas turbine combines cutting-edge technology with robust performance characteristics. Its advanced combustion system, high thermal efficiency, modular design, and compatibility with various fuels make it an excellent choice for power generation and industrial applications, ensuring environmental compliance and operational excellence.