Assembly
Main Tower
1 | Terminal Base |
|
•“Snap” the main tower into the terminal base.
Traffic Control Top
2
•“Snap” the traffi c control top into the main tower.
•“Snap” the free end of the air track into the slots in the top of the control tower.
Security Gate
3
•“Snap” the security gate into the slots in the terminal base.
B
Air Tracks
C
C
A
Loading Station
4
•Fit the loading station onto the terminal base.
Trestle Base
Trestle Post
5
•Connect the trestle base to the trestle post.
•Lift the terminal base and lower to “snap” onto the trestle assembly, as shown.
| Air Track |
A | with Support |
B
Track with Tabs
6 | 7 |
Air Tracks
B
A
8
Awning
9 | Baggage Platform |
|
10
•Position the air track with support above the terminal base assembly.
•First, “snap” the ends of the support into the slots in the loading station A.
•Then, fi t the tabs on the track into the slots in the terminal base B.
•Fit the track with tabs into the slots in the terminal and the trestle assembly. Push down to “snap” in place.
5
•Slide to attach an air track to each free end of the track on the base assembly A.
•Fit an air track onto each end of the track assembly B.
•Attach the remaining ends of the air track C.
•“Snap” the awning into the baggage platform.
6
•Track pieces easily snap together.