Installation (reference) – HIP-xxxBE11, -xxxBE11-BO2
For questions regarding mounting profiles for modules, please contact your local dealer.
φ |
Metal fitting (4 places)
Mounting
Structure Rail
Metal fitting | Solar Module |
SPECIFICATIONS
Notes on specification
(1) Powered specifications are measured at Standard Test Condition Irradiance of : 1000W/m2, 25oC cell temperature and solar spectral irradiance per IEC
(2)The current output for these modules as shown in the Specifications is measured at Standard test conditions. These conditions may not be frequently observed in actual practice.
Mechanical Loading
The modules should be mounted at the 4 or more points as shown in
static state) on the module surface is possible.
CERTIFICATION
M6 Nut
Spring washer
Flat washer
Metal fitting
Mounting Structure Rail
Module
The
M6 Bolt/setscrew Mounting Structure Rail |
|
End of Module | Between Modules |
WIRING
General
Figure1-2 : Installation
All wiring should be done in accordance with applicable electrical codes.
All wiring should be done by the qualified licensed professional.
Wiring should be protected to help ensure personal safety and to prevent its damage.
All modules connected in series should be of the same model number/type.
Do not connect modules in parallel without using a connection box.
Electrical Specifications
|
|
|
|
| ||||||
|
|
|
|
|
| |||||
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| ||||||
|
|
|
|
| ||||||
|
|
|
|
| ||||||
|
|
|
|
| ||||||
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
*HIT= Hetero junction with Intrinsic
3 | Printed in Europe 20.10.2006 |