DEH-2130R,2100R
-Removing the Guide Arm Assy
1.Remove a connector, a spring A and B
2.Drive the Guide Arm Assy up aslant into rear side direction, then remove it from a Pin. Finally, drive the assembly approximately 45 degrees upward, then slide the assembly toward left side to remove it.
Note : When assembling the guide arm assembly, route the cord inside the assembly. In this operation, care must be exercised so that cord may be caught by the gear.
-Removing the LO Arm Assy
1. Remove two Pins to dismount the LO Arm Assy.
-Removing the Control Unit and the Spindle
Motor
1.Remove from the connector after mounting the short pin on the flexible PCB of the pickup unit.
2.Remove two Soldered joints, then remove two Screws A.
3.Remove two connectors and a Screw B.
4.Disengage the Control Unit from two Tabs, then dis- mount the unit by sliding it toward left.
5.Dismount the Spindle Motor.
Guide Arm Assy Section
A
B
Pin
LO Arm Assy Section
Short Pin
Spindle Motor
B
Control Unit
A A
50