LG Electronics Universal Kit installation instructions

Page 26

Setting Procedure

1Move the lever and batting switch fully in the movable range.

2 Release the lever and batting switch, and leave them unloaded.

Move Lever Horizontally (LEVER-H)

Move the lever fully to the left or right, and then leave it unloaded.

Move Lever Vertically (LEVER-V)

Move the lever fully to the top or bottom, and then leave it unloaded.

Batting Switch (BAT)

Move the batting switch fully, and then leave it unloaded.

3Move the SERVICE Button to align the arrow with EXIT WITH SAVE, and press the TEST Button. Save the settings, and return to the Game Test Menu Screen.

If you press the TEST Button with the arrow aligned with EXIT WITHOUT SAVE, you return to the Game Test Menu Screen without making change to the settings.

After adjustment, be sure to use INPUT TEST to check that the values change properly according to the operations you make. If no improvements are observed even after the settings are retried, a component such as the lever or batting switch may have failed.

24

Image 26
Contents Universal Kit Warranty World Series Sega Naomi System Kit Contains List Desc Qty Assy Ctrl PNL 2A4B2S MB2K2 ENG NOA-20010-01 Item no Description Allseganaomikits Installation Instructions Installation Instructions Test Jamma I/O BD Service Switch Specifications Page Contents of Game Game Screen Pitchers Fielding Team OUT Fast Ball R E W Slider Sinker Curve CHANGE-UP Forkball ETC Page Test Mode Game Test Mode Input Test Screen Game Assignments Very Easy Easy Normal Hard Very Hard Volume Setting Page Number of Games Backup Data Clear Game Board KEY Chip Soft KIT + 2 + 3 + Vac Input Page Visit OUR Website