Vision Fitness ST750 manual E P 8 Light Blue BAG

Page 17

S T E P 8 LIGHT BLUE BAG

Attach the stabilizer tube (AG4) to the weight stack tower by inserting two bolts (M10x140) and two flat washers (10.2x22x2) through the bracket and the tower tube. Fasten two flat washers (10.2x22x2) and two nylon nuts (M10). Attach two bolts (M10x70), four flat wash- ers (10.2x22x2), and two nylon nuts (M10) to the opposite end of the tube.

Install the left (AE2) and right (AE1) handlebars on the seat support (AC1) using two bolts (M10x75), four flat washers (10.2x22x2), and two nylon nuts (M10).

Install seat bottom (J02) on seat support using four bolts (M10x25).

Mount the thigh pad (J03) onto the thigh support (AD3) using two bolts (M10x70).

Attach the seat back (J01) to the seat back post (AJ1) using four bolts (M10x25). Insert seat back post into seat back support tube. Thread pull pin into seat back support until the seat back post locks into location.

Slide leg pad (J04) onto leg pad shaft (AD2) and secure using disc (D41), a flat washer (8.4x15.5x1.6), a lock washer (8.2x15.4x2), and a bolt (M8x25).

17

Image 17
Contents S e m b l y & O w n e r ’s G u i d e Page Table of Contents S e m b l y N e r ’ s G u i d e E P Blue BAG Orange BAGE E N B a G Pink BAGYellow BAG Black BAGLight Blue BAG E P 1 Orange BAG Blue BAG Pink BAG E P 4 Green BAG E P 5 B L a C K B a G E P 6 Y E L L O W B a G D B a G E P 8 Light Blue BAG Resistance Training Benefits and Tips Training Programs Stretching BICEP/CHEST Stretch E M ST750 Commercial Warranty Page Page Page Page S i o n
Related manuals
Manual 28 pages 36.13 Kb