Vision Fitness ST760 manual E P 6 Y E L L O W B a G

Page 15

S T E P 6 Y E L L O W B A G

Q05Q06

Q01

Q03

Q02

AB1

Align holes in rear shield (Q01) with the holes in the brackets on the back side of the weight stack tower (AB1); secure using 10 bolts (M5x10). Take the left side shield (Q03) and repeat on front side of weight stack tower using six bolts (M5x10). Tighten interior brackets (B09 & B10). Attach right side shield (Q02) with six bolts (M5x10)

Place slip-on nuts over holes on the left upright of the weight stack tower (AB1). Snap two top covers (Q05 & Q06) together. With tallest point facing the rear of the machine, place the top covers on top of the weight stack tower and secure using six bolts (M5x15).

15

Image 15
Contents S e m b l y & O w n e r ’s G u i d e Page Table of Contents S e m b l y N e r ’ s G u i d e E P Blue BAG Orange BAGGreen BAG Pink BAGYellow BAG Black BAGRED BAG E P 1 Orange BAG Blue BAG Pink BAG E P 4 Green BAG E P 5 B L a C K B a G E P 6 Y E L L O W B a G D B a G Page Resistance Training Benefits and Tips Training Programs Stretching BICEP/CHEST Stretch E M ST760 Commercial Warranty Page Page Page Page S i o n