MAINTENANCE SCHEDULE
FOR BEST PERFORMANCE WE RECOMMEND THE FOLLOWING MAINTENANCE SCHEDULE:
Check the integrity and function of the following parts. Replace all worn components immediately.
I T E M
CABLES
CHECK END FITTINGS AND CABLE JACKET
COATING. CHECK TIGHTNESS OF WEIGHT STACK LOCKING NUT. REPLACE CABLES ANNUALLY.
UPHOLSTERY
WIPE DOWN AND DRY. CLEAN AND CONDITION.
FRAME
WIPE WITH WATER DAMPENED CLOTH AND DRY
COMPLETELY. POLISH AND WAX.
CHROME
WIPE WITH WATER DAMPENED CLOTH AND DRY
COMPLETELY. POLISH AND WAX.
NUTS/BOLTS/FASTENERS
TIGHTEN AND/OR ADJUST AS NEEDED.
GUIDE RODS
LUBRICATE AND CLEAN.
ADJUSTMENTS/LOCKING PINS/
TIGHTENING KNOBS
WEIGHT STACK PIN
WARNING/INSTRUCTION LABELS
HAND GRIPS
DAILY
•
•
•
•
WEEKLY
•
•
•
•
•
•
•
•
•
•
•
22