www.evofitness.com 21
ASSEMBLY
STEP 3: Assemble The Side Handlebars
NOTE: Side rails are interchangeable for use on both right and left sides. Make sure all wires are recessed into the frame. DO NOT trap or pinch
A)Connect the Left Motion Control lower wire to the middle wire. (208 to 308). As Shown in the diagram below.
B)Insert the Left Handlebar (201) into the Upright Tube. Use one M8x15mm bolt (804) to secure the upper portion. Use two M8x50mm bolts to secure the lower portion to the base frame.
C)Repeat the above process for the Right side.
804X2
805X4
308
208
804
301 | 804 | |
201 | ||
|
201
301202
805
202
805