2.With the help of a second person, raise the Uprights (20) to the vertical position.
Remove the knob from the pin. Make sure that the collars and the spring are on the pin. Next, press the Latch Insert (77) into the left Upright (20). Use a rubber mallet if nec- essary. Then, insert the pin into the Latch Insert, and tighten the knob back onto the pin.
3.With the help of a second person, raise the Walking Platform (15) to the storage position and engage the latch pin as described on page 28.
Next, position the Base Plate (126) on the treadmill as shown. Attach the Base Plate with three Base Plate Bolts (125). Note: It may be helpful if a second person tips the treadmill slightly as you tighten the Bolts.
If the treadmill rocks slightly, turn one or both of the Leveling Feet (130) under the Uprights (20) until the rocking motion is eliminated (see page 31). Carefully lower the Walking Platform (15) to the floor as described on page 29.
4.Cut the tie securing the Pulse Wire (74) to the right Upright (20). Hold the Pulse Bar Assembly (69) near the crossbar on the Uprights. Connect the Pulse Wire to the wire in the Pulse Bar Assembly. The connectors should slide together easily and snap into place. If they do not, turn one connector and try again. Then, insert the wires into the crossbar.
Open parts bag B. Attach the Pulse Bar Assembly (69) to the crossbar on the Uprights (20) with four Pulse Bar Bolts (13) and four Star Washers (67). Start all four Pulse Bar Bolts before tightening them. Make sure that no wires are pinched.
2
Knob | 77 |
|
Spring
| Pin |
20 | Collar |
| |
3 | 15 |
| |
| 125 |
130 | 20 |
| |
126 | 130 |
4 |
|
| 13 |
| 67 |
| Crossbar |
| 13 |
| 67 |
| 74 |
| 69 |
74 | 20 |
|
7