|
| 28 |
| 3/8 X | 23 |
|
| 51 |
|
| E |
|
| 42 |
W | AY | (a) |
| ||
|
| 28 |
|
| 49 |
|
| L |
| 3/8 X |
|
|
| (b) |
|
| FIGURE 31 |
STEP 31:
•Securely assemble the ball end of the AB CRUNCH CABLE (AY) and one
See FIGURE 31(a) (NOTE: TheAB CRUNCH CABLE (44) should be routed underneath the retaing bolt as shown in FIGURE 31.)
•Route theAB CRUNCH CABLE (AY) around one
•Screw the threaded end of the AB CABLE (AY) into the end of the FLOATING PULLEY BRACKET (W) .See FIGURE 31.
29