Life Fitness manual SM60 Unpacking & Assembly Instructions

Page 5

SM60 Unpacking & Assembly Instructions

Figure 3. Set the weight stack cubes.

2.Bolt on the teardrop pulleys above the benches (see Figure 4) on both cubes using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams). Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt holes.

5

Image 5
Contents M051-K50-A136 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contents box 1 on left, box 2 on rightSM60 main components AssemblySM60 Unpacking & Assembly Instructions Bolt on the teardrop pulleys Configuration for 2-3/4 and 3 bolts 150 lb. weight stack 300 lb Weight stack Bolt on the top plate SM60 Unpacking & Assembly Instructions Mount the benches to the frame Removing the pulley bolts Installing the CablesCrossover Cable Routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware Hardware . Assembly PartsHardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Hardware installed InstalledPulley hardware Floating pulley