4.Slide the Support Tube (32) onto the Base (1). Attach the Support Tube to the Base with two 3/8Ó x 2Ó Bolts (43) and two 3/8Ó Nylon Locknuts (39).
Do not tighten the Nylon Locknuts yet.
5.Attach the Support Tube (32) to the Right Wheel Channel (4) with two 3/8Ó x 1Ó Bolts (16) and two 3/8Ó Nylon Locknuts (39). Note: You need to attach the lower Bolt and Nylon Locknut first.
Attach the Tube (32) to the Left Wheel Channel (3) in the same manner.
Tighten the Nylon Locknuts used in steps 3Ð5 now.
6.Attach the Large Wheel (19) to the Inner Lift Tube (17) with 1/2Ó x 2 1/2Ó Bolt (52) and a 1/2Ó Nylon Jam Nut (50).
7
4 |
|
| 32 |
39 |
|
43 | 39 |
| 43 |
1 |
|
5 |
|
39 |
|
16 |
|
39 |
|
4 | 16 |
| |
| 32 |
3 |
|
6 |
|
17 |
|
50 |
|
52 |
|
19 |
|