Evo Fitness 51551 owner manual TOP Cable

Page 17

ASSEMBLY

Step 10:

ROUTING THE TOP CABLE:

Insert the bolt end of Top Cable (48) through Pulley T1 (Ball End outside). Route cable over Pulley T2, down and around pulley T3, up and around pulley T4, down and attach to Select Rod (32) at least

7 threads.

ball end

T1

 

 

assembly

TOP CABLE (48)

bolt end

instructions

 

T2

T4

T3

T5

T1

T3

T2

T4

T5

-17-

Image 17
Contents EVO Tahoe Home Gym Before Beginning PreassemblyMajority of the Listed Hardware is Already in Place Parts listMajority of the Listed Hardware is Already PlaceLink Chain Bushing Parts diagram Instructions AssemblyAssembly instructions Assembly Assembly instructions Two 1/2 Nylon Nuts Assembly instructions Assembly instructions Assembly instructions Assembly instructions TOP Cable PEC DEC Cable Lower Cable Assembly instructions Page Warranty WarrantyImportant Steps Important stepsExercising Target heart rateYour Target Zone Muscle Chart Muscle chartWarm Stretching routineUP and Cool Down Shoulder Lift