Assembly
Step 15: Connect the Right Squat Cable through the Floating and Main Assembly Pulleys
15-1Unwrap the Right Squat Cable from the Pulley on the front of the Base.
15-2Put the cable under the cable shroud and under and through the Rear Cross Bar Pulley. Follow the arrows. 15-3Put the cable down through the Inner Right Frame Rail Pulley and up through the Right Pulley Arm Pulley. 15-4Put the cable end through the Cable End Ball Stop (A).
15-5Attach the Cable Core (B) to keep the cable from falling out of the pulleys.
15-6Repeat steps 15-1 through 15-5 on the opposite side.
A
B
20