FIGURE 4
Step 20. Push 2” SQUARE END PLUGS (71) into each end of TOP CROSS FRAME (10).
Step 21. Place TOP CROSS FRAME (10) into top of VERTICAL FRAMES (3 RIGHT & 5 LEFT) and over GUIDE RODS (9) with SHROUD BRACKETS facing front as shown.
Step 22. Attach RIGHT TOP CROSS FRAME (11), LEFT TOP CROSS FRAME (4) and TOP CROSS FRAME (10) to RIGHT VERTICAL FRAME (3) and LEFT VERTICAL FRAME with 3/8” x 3” HEX BOLTS (54), 3/8” WASHERS (62) and 3/8” LOCKNUTS (67).
| 71 |
| 2” SQUARE |
| END PLUG |
| 62 |
11 | 3/8” |
WASHER | |
RIGHT TOP |
|
CROSS |
|
FRAME |
|
67
3/8”
LOCKNUT
3
RIGHT
VERTICAL
FRAME
FIGURE 4
54
3/8” x 3”
HEX BOLT
10 TOP CROSS FRAME
71
2” SQUARE END PLUG
SHROUD
BRACKET
9
GUIDE
ROD
12
LEFT TOP
CROSS
FRAME
54
3/8” x 3”
HEX BOLT
62
3/8”
WASHER
67
3/8”
LOCKNUT
5
LEFT
VERTICAL
FRAME
16