Huffy M732201 manual Do not Over

Page 12

4. Install rod (7) through holes in bottom pole section (6) and eyebolt (8).

8

6

7

5. Install wheel axle (2) through wheel carriage (19) and install wheels (3) onto wheel axle (2) with spacers (17) as shown. Insert pole assembly into tank assembly as shown. Secure bottom pole (6) section to tank and wheel carriage as shown. A deep socket is recommended.

WARNING!

TWO CAPABLE ADULTS

REQUIRED FOR THIS

PROCEDURE. FAILURE TO

FOLLOW THIS WARNING

COULD RESULT IN SERIOUS

INJURY AND/OR PROPERTY

DAMAGE.

IMPORTANT!

THE SPACER (17) WILL FIT LOOSELY UNTIL SECURED INTO THE CAVITY OF THE BASE.

 

3

19

17

 

 

17

 

 

 

 

3

 

 

2

6

7

8

IMPORTANT!

 

The Warning Label

 

should be facing

9

towards the front.

IMPORTANT!

DO NOT OVER

TIGHTEN

ID# M732201 01/06

12

Image 12
Contents Write Model Number From Box Here Before YOU Start Moving Product Registration Get to know the basic parts of your basketball system Parts List See Hardware Identifier Hardware Identifier Bolts & Pins Item #7 Item #44 Section a Assemble the Base Align dimple of top pole into trough of middle pole as shown Dimple Hole Do not Over Orientation of Struts Section B Attach the Backboard TOP View Ratchet Assembly USE EYE Protection 01/06 ID# M732201 10. B 01/06 ID# M732201 Install Rim to Backboard If Using Sand 2 Gallons of ANTI-FREEZE is not Required