Spalding M8860411 manual To the top of the nut Figure a

Page 14

13.

Before starting, tighten assembly bolt (14) at 6-3/4” from the end of the bolt

 

to the top of the nut (Figure A)

Remove rim cover (16), attach rim assembly (3) to backboard (10) and reattach rim cover (16).

** For rim assembly see instructions included with rim.

FIGURE

A.

5

6

10

IMPORTANT!:

Carefully cut and peel protective film away from board prior to attaching rim.

Rim Assembly

3

39

39

8 7

Refer To Instructions

Included With Rim

Hardware For Rim

Assembly.

ID# M855441

06/05

14

Image 14
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Side View Build drainage hillInsert bushings 27 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly ID# M855441 06/05 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 10 to upper and lower First attach board 10 to upper yokeTo the top of the nut Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators To lower yoke in areaE Y C a FA L R P U S Have Been Fully Tightened Feet 3.05 m Limited Lifetime Warranty