Spalding M8860411 manual Playing Surface, Mounting plate 2 as shown

Page 8

7A.

Rest top of pole on a piece of scrap wood (not included) and line up holes in pole to holes in

 

mounting plate (2) as shown.

WARNING!

THREE PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

PLAYING SURFACE

SCRAP WOOD

(NOT INCLUDED)

2

PLAYING SURFACE

7B.

Insert bolt (15) through holes in plate and pole and secure with nut (22).

1

15

22

ID# M855441

06/05

8

Image 8
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Side View Build drainage hillInsert bushings 27 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly ID# M855441 06/05 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 10 to upper and lowerYokes 18 First attach board 10 to upper yokeTo the top of the nut Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown To lower yoke in areaE Y C a FA L R P U S Have Been Fully Tightened Feet 3.05 m Limited Lifetime Warranty