Spalding M8860411 manual Insert bushings 27 into areas shown

Page 7

6.

27

27

Insert bushings (27) into areas shown.

27

27

27

27

27

10

27

27

27

1

27

17

27

27

18

27

27

27

7

06/05

ID# M855441

Image 7
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Build drainage hill Side ViewInsert bushings 27 into areas shown Mounting plate 2 as shown Playing SurfaceCompleted Assembly ID# M855441 06/05 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket First attach board 10 to upper yoke Using TWO people to hold the boardAttach backboard 10 to upper and lower Yokes 18To the top of the nut Figure a To lower yoke in area Apply height indicator labels 32 & 31 to height indicatorsAttach height indicators Install net 4 to rim as shownE Y C a FA L R P U S Have Been Fully Tightened Feet 3.05 m Limited Lifetime Warranty