Spalding 21166904 manual Contact Utilities Before Digging

Page 3

1. Ensure ground is level with playing

 

 

 

 

surface, then dig pole hole.

 

 

 

 

 

WARNING

 

 

PLAYING

 

 

 

 

SURFACE

 

 

 

 

 

CONTACT UTILITIES

 

 

 

 

 

BEFORE DIGGING.

 

 

24" (61 cm)

 

 

 

 

 

36" (91.4 cm)

 

 

 

 

 

GROUND

 

 

 

 

SURFACE

2.

Install nut (2) to J-bolt (1)

2

2”

3

2

 

 

as shown. Repeat

(5.08 cm)

 

 

 

 

 

 

 

procedure for other three

 

 

 

 

 

J-bolts (1).

 

 

 

 

 

IMPORTANT!

 

 

 

 

 

Make sure nuts are 2”

 

 

 

 

 

(5.08 cm) from top of J-Bolts.

1

 

 

 

 

 

 

 

2

 

 

 

 

 

3. Install threaded ends of J-bolts (1) through holes in

1

 

 

 

mounting plate (3) and secure as shown.

 

 

 

NOTE: Make sure J-bolts (1) are in the illustrated

 

 

 

 

position.

 

 

 

 

 

NOTE: Nuts on the top of plate are used for leveling

 

 

 

 

the pole after system is fully assembled.

 

 

 

 

 

3

 

10/04

P/N 21166904

Image 3
Contents IMPORTANT! Have any questions?...Don’t go back to the store In-Ground Basketball System21166904 10/04 Contact Utilities Before Digging 21166904 10/04 10/04 211669 21166904 10/04 10/04 Page 10/04 P/N Side View Do not depress valve stems 211669 10/04 Opposite Side View NUT 42 Onto Bolt 19 BPage RIM Assembly & Installation Bottom View Leveling Instructions 05 m FeetPage Secure pole pad 35 as shown 10/04 P/N Page Jam Hex Nuts Hardware Identifier Item #30