Spalding 21166904 manual Opposite Side View

Page 13

18. Run the cable from strut assembly around the pole, through the hole in the vertical support (18) and down through the hole in the cable bracket as shown (20). Place one nut on top of the cable bracket and one below as illustrated. Tighten the bottom nut until 1/8” of thread is exposed as illustrated.

20

18

Opposite Side View

13

10/04 P/N 21166904

Image 13
Contents IMPORTANT! Have any questions?...Don’t go back to the store In-Ground Basketball System21166904 10/04 Contact Utilities Before Digging 21166904 10/04 10/04 211669 21166904 10/04 10/04 Page 10/04 P/N Side View Do not depress valve stems 211669 10/04 Opposite Side View NUT 42 Onto Bolt 19 BPage RIM Assembly & Installation Bottom View Leveling Instructions 05 m FeetPage Secure pole pad 35 as shown 10/04 P/N Page Jam Hex Nuts Hardware Identifier Item #30