13. Install vertical supports (18), nuts (2), washers (4) and bolts (53) as shown.
4
2
2
4
53
4
53
4
18
IMPORTANT!
The end with the double holes need to be toward the playing surface
9 | 10/04 P/N 21166904 |
13. Install vertical supports (18), nuts (2), washers (4) and bolts (53) as shown.
4
2
2
4
53
4
53
4
18
IMPORTANT!
The end with the double holes need to be toward the playing surface
9 | 10/04 P/N 21166904 |