4. Fill hole with concrete. Tamp down concrete to release air pockets and build drainage hill.
5. Insert
NOTE: Check leveling of mounting plate (3) several times while concrete is curing.
IMPORTANT!
Front of mounting plate (3) must be parallel with playing surface.
WARNING
DO NOT PROCEED TO STEP 6 UNTIL
CONCRETE HAS CURED FOR A
MINIMUM OF 72 HOURS. ALLOW
ADDITIONAL TIME FOR COLD, WET
OR HUMID WEATHER.
PLAYING SURFACE |
3
P/N 21166904 10/04 | 4 |