4. Fill hole with concrete. Tamp down concrete to release air pockets and build drainage hill.

5. Insert J-bolts (1) from mounting plate (3) into cement as shown. Move assembly around to release any air pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to level mounting plate on top of drainage hill. Level mounting plate and square with playing surface. Clean off any excess cement on mounting plate at this time.

NOTE: Check leveling of mounting plate (3) several times while concrete is curing.

IMPORTANT!

Front of mounting plate (3) must be parallel with playing surface.

WARNING

DO NOT PROCEED TO STEP 6 UNTIL

CONCRETE HAS CURED FOR A

MINIMUM OF 72 HOURS. ALLOW

ADDITIONAL TIME FOR COLD, WET

OR HUMID WEATHER.

PLAYING SURFACE

3

P/N 21166904 10/04

4

Image 4
Contents In-Ground Basketball System IMPORTANT! Have any questions?...Don’t go back to the store21166904 10/04 Contact Utilities Before Digging 21166904 10/04 10/04 211669 21166904 10/04 10/04 Page 10/04 P/N Side View Do not depress valve stems 211669 10/04 Opposite Side View 19 B NUT 42 Onto BoltPage RIM Assembly & Installation Bottom View Leveling Instructions Feet 05 mPage Secure pole pad 35 as shown 10/04 P/N Page Jam Hex Nuts Hardware Identifier Item #30