9.Slide a Pad Tube (50) into a hole in the Leg Lever (4). Wet both sides of the Pad Tube with soapy water. Slide two Large Foam Pads (51) onto the Pad Tube as shown. Press two 19mm Square Inner Caps (53) into the Pad Tube.
Repeat with the other Pad Tube and the Leg Lever.
Slide the Long Pad Tube (82) into the hole in the Leg Lever Bracket (7). Wet both sides of the Pad Tube with soapy water. Slide two Small Foam Pads (52) onto the Tube as shown. Press two 19mm Square Inner Caps (53) into the Pad Tube.
10.Attach the Curl Pad (14) to the Curl Post (5) with two M6 x 16mm Screws (63).
11.Press a Round Angled Bushing (45) into a Rack Foot (35).
Attach a Guide Bar (32) to the Rack Foot (35) with an M10 x 30mm Button Screw (56) and an M10 Washer (67). Tighten the Screw.
Using a rubber mallet, tap the Right Upright (62), which has numbers on the indicated side, onto the Rack Foot (35). Attach the Right Upright to the Rack Foot with two M10 x 65mm Button Bolts (60), four M10 Washers (67), and two M10 Nylon Locknuts (69). Make sure the Bolts are inserted from the side shown. Do not tighten the Locknuts yet.
Repeat this step with the Left Upright (31 [not shown]), Guide Bar (32), and Rack Foot (35). Insert the M10 x 65mm Button Bolts (60) from the other side.
9 | 53 |
|
|
| 7 |
| |
53 | 52 |
| |
|
|
| |
51 | 4 |
| 82 |
|
| ||
| 50 |
| 52 |
|
|
| |
| 50 |
|
|
|
| 51 | 53 |
|
| 53 | |
10 | 14 |
|
|
|
|
| |
|
| 5 |
|
|
|
| 63 |
11 |
|
|
|
| 32 |
| 62 |
|
|
| |
|
|
| Numbers |
|
| 67 |
|
| 69 | 67 |
|
|
|
| |
| 67 |
| 60 |
| 45 | 67 | |
|
| ||
| 35 |
|
|
| 67 |
|
|
| 56 |
|
|
8