STEP 13 (See Diagram 13 & 15)
A.) | Attach the |
| Install a Pulley (#58) to the opening. Attach two Bushings (#56) to the holes on the Leg |
| Developer. Secure it with a M10 x 2 ½” Allen Bolt (#97) and M10 Aircraft Nut (#110). |
B.) | Pull the Cable through the openings to the bracket on the Left Base Frame (#2). Install a Pulley. |
| Secure it with a M10 x 1 ¾” Hex Head Bolt (#92), two ∅ ¾” Washers (#106), and one M10 Aircraft |
| Nut (#110). |
C.) | Continue drawing the cable through the opening on the bottom of the Left Vertical Beam (#4). |
| Install another Pulley. |
D.) | Draw the Cable upward to the Double Floating Pulley Bracket (#30) previously installed in STEP |
| 12B. Install another Pulley. |
E.) | Pull the Cable downward to the Swivel Frame (#26). Install another Pulley. |
F.) | Slide a Ring Cap (#80), Rubber Ball (#79) and ∅7/8” Washer (#78) onto the end of the Cable. |
| Screw a Connector (#48) onto the Cable. See E View. |
| DIAGRAM 13 |
18